Kraft Goes Out of its Way for Mechanical & Electrical Upgrades in Ely MN

Project: International Wolf Center – Ely MN
Completion Date: Winter 2026, Construction Cost: $661,000
Architect/ Engineer: Widseth, Aritectual Alliance
Kraft Field Superintendents:
Mike Prokkot – Pipefitter
Chris Johnson – Sheetmetal

PROJECT

Kraft Mechanical was the General Contractor for the recent HVAC upgrade at the International Wolf Center Located in Ely MN. Kraft overhauled the piping and ductwork serving their HVAC system. Work included Replacement of a Roof top unit, a Air Handling Unit, (3) condensing boilers, (3) Furnaces, and (9) Fan Coil Units. Kraft worked closely with the DNR and International Wolf Center to carry out work during the heating system with building still in operation. Kraft’s sister company CAP Electric upgraded the electrical systems serving the new mechanical equipment. The Project delivered a more efficient and maintenance free system for the Wolf
Center.